Architectural-Engineering Design Services

 

 “Being responsive to the needs and challenges of our clients is key and our top priority."
-Denise Vigil, President

 

Project Description

SCC Infrastructure Upgrades

Los Alamos National Laboratory, Los Alamos, NM

 

Scope of Work:

Our final design for this project modified and upgraded the existing mechanical and electrical infrastructure system in the SCC. This design required us to prepare for the first phase of liquid cooled supercomputing at LANL. It also incorporated long range planning for the next phase of supercomputing anticipated for arrival at LANL in 2017 as well as the ultimate objective of planning for Exascale supercomputing anticipated for arrival at LANL in 2020. Construction was completed in 2015.

 

 <BACK TO PROJECT PAGE